jessecornwell7 jessecornwell7
  • 02-04-2020
  • Computers and Technology
contestada

What element of a timeline helps to mark progress of the project?
O A. milestones
O B. job responsibilities
O C. external deliverables
OD. internal tasks

Respuesta :

Kekebad578
Kekebad578 Kekebad578
  • 02-04-2020
The answer is A.milestones
Answer Link

Otras preguntas

How are continental volcanoes formed?
If a potato is allowed to dehydrate by sitting in open air, would the potato cells be more likely to absorb more water or less?
Which is larger 7% or 0.7 why?
Which words in this sentence are common nouns? Aztec crops, such as corn and beans, were unknown in Europe. Choose all answers that are correct. A. Aztec B. c
What is 258/300 written as a decimal and a percent???
Which two things are being compared in the poem?harbors and cities  fog and cats  cat feet and harborsfog and moving
Simplify the expression. [90 – (12 + 13)](15 ÷ 3)
one meter is approximately equal to 39.39 inches. about how many inches are in 5 meter
2x-y=-63x-4y=-4Solve using elimination and then substitution
walter buys a bus pass for 30$. everytime he rides the bus money is deducted from the value pass. he rode 12 times and 24$ was deducted from the pass. how much