ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

what are simultaneous equations​
HELP MEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE write and solve a proportion to complete the statement. Round to the nearest hundredth if necessary. 1. 6km ≈ ?mi 2.
Which of these combinations of media would be the BEST way to show and tell about the migration of the monarch butterfly?Show a series of ten still pictures wit
Solve the Proportion. 10/a = 15/24 a=?
Express (x-8x)^2 as a trinomial in standard form
In a written message, a claim must be______ with strategic support O described O discredited O expanded O proven.
Different ways to say, "As you can see"
Check The tiles on the left contain functions written using function r g(f) = 2f f(h) = h - 7 h(g) = -4+g
who was the first president of kenya​
Graph the line passing through (6, 1) whose slope is m = 3.