agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

What were some events/things that caused the Great Depression?
how do day and nightat uranus's equator change asthe uranus revolves around the sun?
which explorer sailed for france?
how do day and nightat uranus's equator change asthe uranus revolves around the sun?
Please I have the answers I just want to double check them and Solvekey: B=42  A=93  N=29  X=361. (b-7)(2b-7)2. (4a-4)(5a-7)3. (5n-6)(4n+7)4. (2n=8)(8n+3)5. (6x
which explorer sailed for france?
Which of the allies suffered the greatest losses on D-Day
Suppose you ride your bicycle to the library traveling at 0.5 km/min. It takes you 25 minutes to get to 1.3 the library. How far did you travel?
The significance of the Open Door Policy for the United States lay in its (A) providing a use for the Philippines as a way station between China and the United
what is the kingdom and phylum of a euglena protest?