henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

Who will manage the Common Core State Standards in the future?A) CCSSO and NGAB) NEA and AFTC) Federal governmentD) Not mentioned
While a gas does 855 J of work on its surroundings, 1800 J of heat is added to the gas. Does the internal energy of the gas increase or decrease, and by how mu
a story of vengeance
A triangle has a base of 4 inches and height of 6 inches. What is the area of the triangle? 10 in2 12 in2 20 in2 24 in2
*nitric oxide* is another *compensatory mechanism* that vasodilates and decreases ___________a. blood pressureb. heart ratec. blood glucose levelsd. respiratory
In the process control system the signal that represents set point is generated in the a. transmitter b. Sensing device c. controller d. storage tank
storyline experience in going to school.
Which two potential lending sources would be the BEST place for you to get a loan? Using trusted sources on the web, select two potential lending sources you th
Can someone please help me? Please show work. I will give brainliest if it’s correct!
Brrrrreeejejennendiioo.