Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

plant A is 18 inches tall after one week 36 inches tall after two weeks 56 inches tall after three weeks plant B is 18 inches tall after one week 36 inches tall
0.2121 this repeating decimal as a fraction
how do you say hello
bella pays 7 payments of $5 each to a game store. she returns one game and receives $20 back. What is the change to the amount of money she has?
Once transcription is complete, strands of RNA are sent to the cytoplasm to attach to- A. mitochondria B. lysosomes C. Golgi bodies D. ribosomes
which of the following compounds is not ionic? a. nai b. cacl2 c. co2 d. na2o
Why do amoeba need to change shape?
order 7/9, -0.8, and the square root of 3 from least to greatest
What is 0.076 in scientific notation
If angle a is equal to the angle be in the supplement of angle B has a measure of 22° then what is angle a equal to