To complete a job a crew of 8 people needs 18 days. How long will the same job be finished if the crew will have 9 people?

Respuesta :

rockyrules789 rockyrules789
  • 01-11-2019

Answer:

16

Step-by-step explanation:

.

Answer Link
lajfoaofje lajfoaofje
  • 27-06-2020

Answer:

16

Step-by-step explanation:

Answer Link

Otras preguntas

Calculate the force on an object that has a mass of 12kg and an acceleration of 4m/s2.
Help me please! Can you give me a brief summary on the XYZ affair.
Lily wants to make a banquet of 2 dozen flowers. She picked 5 roses, 6 daisies, and 7 tulips. How many more flowers does Lily need?
The portion of the DNA double helix requiring the least energy input to form the bond is the The portion of the DNA double helix requiring the least energy inpu
Rocky uses online banking and averages 30 transactions monthly. Which bank should he choose and how much would he save in one month A bank of Broadway, $36 B B
How did the location of the arabian peninsula help the muslims conquer territory beyond the arabian peninsula?
Graph the line. y=-3+2
why was new hampshire founded
On a weather map, isobars are lines that connect points of equal air pressure, and letters mark fronts. Please select the best answer from the choices provid
The length of a classroom is 34 feet. What is this measurement in yards and feet? Milton purchases a 5-gallon aquarium for his bedroom. To fill the aquarium w